Sungrow Solar Floating Solar Panels Mounting System
BC-002F Floating PV Mounting System, it was widely used on water PV power installation, that can economize land resources and has minor influence on water ecological environment. The coverage of water surface can reduce the evaporation loss of water.
Water has cooling effect on solar panels, which can inhibit the rise of module temperature, and can increase 10~15% higher power generation than traditional groud or roof PV mounting system.
1. Compatible with different photovoltaic modules.
2. Strong structure and low cost.
3. Pre-assembled mode, saving installation time.
4. The main parts are made of aluminum alloy.
5. The component layout can be horizontal or vertical.
- Power Stone
- China,Vietnam,Indonesia
- 10001-100000w per 15days, >100000w to be negotiated
- 100MW Per Month
- Information
BC-002F Floating PV Mounting System, it was widely used on water PV power installation, that can economize land resources and has minor influence on water ecological environment. The coverage of water surface can reduce the evaporation loss of water.
Water has cooling effect on solar panels, which can inhibit the rise of module temperature, and can increase 10~15% higher power generation than traditional groud or roof PV mounting system.
1. Compatible with different photovoltaic modules.
2. Strong structure and low cost.
3. Pre-assembled mode, saving installation time.
4. The main parts are made of aluminum alloy.
5. The component layout can be horizontal or vertical.
System Parameters | |||
Installation Site | Lake, Reservoir | Design Standard | AS/NZS 1170、ASCE7-10 |
Tilt Angle | 0-15° | JIS C 8955:2017 International Building code:IBC 2009 | |
Wind Load | 42m/s | Material | HDPE |
Snow Load | 1.0KN/m² | Fasteners | SUS304 & HDPE |
Applicable Solar Module | Framed or Frameless | Color | Grey or Customized |
Panel Layout | Landscape or Symmetrical Facing | Warranty | 10 Years |
Q1. What is your terms of packing?
A: Little components packing in export carton box, for ground screw, rail etc packing by steel pallet.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery.
We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDPU, DDP
Q5: How long is the warranty of your products?
A: 5 years for single item; 10 years for the system designed by us.